Sun Microsystems, Inc.   Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

230 Volt AC Power Sequencer

370-1027 370-1155
Pulizzi Engineering
PC874
Pulizzi Engineering
PC874
Outlet Side

Control Side

Notes

  1. Requires AC outlet NEMA L6-30R, 30A, 250V.
  2. Any conversion to the Data Center Cabinet, including replacement of the AC Power Plug or AC Power Sequencer, voids all safety agency approvals.
  3. The Switched 2 output of 370-1027 comes on after a 5-second delay.
  4. The Switched 2 output of 370-1155 comes on after a 20-second delay.

References

  1. Sun Full-Height Rack System Installation Manual, 800-1677.
  2. Sun Rackmountable Fileservers Installation Manual, 800-1676.
  3. Sun 900 Mbyte Disk Drive Installation Manual, 800-1036.
  4. Sun 56-inch Data Center Cabinet and Data Center Expansion Cabinet Installation Manual, 800-3242.
  5. Sun 56-inch Expansion Cabinet Installation Manual, 800-5936.
  6. Sun 56-inch Cabinet Service Manual, 800-6371.

  Copyright © 2011 Sun Microsystems, Inc.  All rights reserved.
 Feedback