230 Volt AC Power Sequencer
370-1155-02 |
Sherwood Enterprises |
Outlet Side |
 |
|
Control Side |
 |
Notes
- Requires AC outlet NEMA L6-30R, 30A, 250V.
- Any conversion to the Data Center Cabinet, including replacement of the AC
Power Plug or AC Power Sequencer, voids all safety agency approvals.
- The Switched 2 output comes on after a 20-second delay.
References
- Sun Full-Height Rack System Installation Manual, 800-1677.
- Sun Rackmountable Fileservers Installation Manual, 800-1676.
- Sun 900 Mbyte Disk Drive Installation Manual, 800-1036.
- Sun 56-inch Data Center Cabinet and Data Center Expansion Cabinet
Installation Manual, 800-3242.
Sun 56-inch Expansion Cabinet Installation Manual, 800-5936.
Sun 56-inch Expansion Cabinet Service Manual, 800-6371.
|