Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition | |||
|
|
Solution Type Technical Instruction Sure Solution 1003333.1 : Sun Fire[TM] 6800: What happens if one power grid fails?
PreviouslyPublishedAs 204627 Description This article addresses what happens if a power grid fails on a Sun Fire[TM] 6800. Steps to Follow The Sun Fire 6800 has two power grids: If power grid0 fails:
If power grid1 fails:
You can verify this by running a SC> showboards -p power SC> showboards -p power Component Pwr Grid --------- --- ---- SSC0 On No grid SSC1 On No grid ID0 On No grid PS0 On Grid 0 PS1 On Grid 0 PS2 On Grid 0 PS3 On Grid 1 PS4 On Grid 1 PS5 On Grid 1 FT0 On Grid 0 and/or Grid 1 FT1 On Grid 0 and/or Grid 1 FT2 On Grid 0 and/or Grid 1 FT3 On Grid 0 and/or Grid 1 RP0 On Grid 0 RP1 On Grid 0 RP2 On Grid 1 RP3 On Grid 1 /N0/SB0 On Grid 0 /N0/SB1 On Grid 1 /N0/SB2 On Grid 0 /N0/SB3 On Grid 1 /N0/SB4 On Grid 0 /N0/SB5 On Grid 1 /N0/IB6 On Grid 0 /N0/IB7 On Grid 1 /N0/IB8 On Grid 0 /N0/IB9 On Grid 1
Please Note: SB and IB boards can be assigned to any Domain in the platform. Thus you need to keep resources allocated to the same grid. This helps the Reliablity & Availability on a power grid failure. Product Sun Fire 6800 Server Sun Fire 3800 Server Sun Fire 4800 Server showboards -p, power, fail, grid Previously Published As 49245 Change History Date: 2006-01-18 User Name: 97961 Action: Update Canceled Comment: *** Restored Published Content *** SSH AUDIT. Roger.Thien@Sun.COM KDO Knowledge Engineer Version: 0 Date: 2006-01-18 User Name: 97961 Action: Update Started Comment: SSH AUDIT. Roger.Thien@Sun.COM KDO Knowledge Engineer Version: 0 Attachments This solution has no attachment |
||||||||||||
|