Solution Type Technical Instruction Sure Solution 1010752.1 : Sun Fire [TM] E2900 Server: Power On Takes a Long Time
PreviouslyPublishedAs 214844 Description Customers have reported that the Sun Fire[TM] E2900 Server takes a long time to power on. A considerable time passes before the LEDs indicate that the platform is powered on. Steps to Follow 1) Power on the Sun Fire Server. The system controller runs SCPOST. If the system controller SCPOST level is set to max, this process takes approximately 20 minutes. While SCPOST is running, there are no LEDs lit on the front panel. It is the responsibility of ScApp to light these LEDs, and ScApp does not load until SCPOST finishes running. It is particularly confusing that The Source A & B LEDs do not light until ScApp is loaded. 2) After powering on the platform, do the following: a) Open the front doors, and you'll see the green LEDS flashing on the four PSUs. b) Look at Fan 3, which is spinning to provide cooling to the system controller. 3) Monitor the progress of SCPOST by establishing a connection to Serial Port A on the back of the server. When the lom shell prompt appears, the System Active and Source A & B LEDs on the front panel are lit. Product Sun Fire E2900 Server Internal Comments The SCPOST takes longer to run on a Sun Fire E2900 Server than on a Sun Fire[TM] V1280 because the Sun Fire E2900 ships with a version 2 system controller. This version has four times as much memory as the original system controller: System Controller, Version 2 = 128 MB memory System Controller, Version 1 = 32 MB memory The bulk of the 20 minutes to run a max level SCPOST on a system Hardware Reset... @(#) SYSTEM CONTROLLER(SC) POST 38 2003/11/18 21:21 PSR = 0x044010e5 PCR = 0x04004000 Memory size = 128MB SelfTest running at DiagLevel:0x40 . . . Memory Test Memory Address MemBankAddrTest: MemBankAddrTest: MemBankAddrTest: MemBankAddrTest: Memory Walking WalkingBankTest: WalkingBankTest: WalkingBankTest: WalkingBankTest: Memory Walking WalkingBankTest: WalkingBankTest: WalkingBankTest: . . . POST Complete. Although, you set SCPOST to the max level after replacing an lom> System Controller Configuration ------------------------------- SC POST diag Level [max]: min Host Watchdog [enabled]: Rocker Switch [enabled]: Secure Mode [off]: lom>
The SCPOST level min takes approximately 2 minutes to run. E2900, power, on, SCPOST, level, max Previously Published As 76426 Change History Date: 2004-05-26 User Name: c8840 Action: Approved Comment: I edited this document, and then submitted it for publication. Version: 0 Date: 2004-05-24 User Name: c8840 Action: Accepted Comment: Version: 0 Attachments This solution has no attachment |
||||||||||||
|