Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition | |||
|
|
Solution Type Technical Instruction Sure Solution 1305752.1 : How To Remove and Replace V210 Power Cord:ATR:843:0
In this Document
Applies to:Sun Fire V210 Server - Version: Not ApplicableInformation in this document applies to any platform. GoalHow To Remove and Replace V210 Power CordSolutionDISPATCH INSTRUCTIONSWHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Nothing beyond basic partner training to be qualified as a Sun Service Delivery Partner. DELIVERY REQUIREMENT: Schedule with maintenance window within contractual terms. Estimate AP Duration = 15 minutes FIELD ENGINEER INSTRUCTIONS Power Cord failed. WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : The Sun Fire V210 server has a single power supply therefore the system will required to be orderly shutdown and powered off. WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Replace the bad power cord. OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Restart software applications per applicable administration guides to resume system operation. PARTS NOTE: Refer to the System Handbook for the country specific type of power cord. REFERENCE INFORMATION: Service Manual and Administration Guide http://download.oracle.com/docs/cd/E19088-01/ Attachments This solution has no attachment |
||||||||||||
|