Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition | |||
|
|
Solution Type Technical Instruction Sure Solution 1310384.1 : How to Replace a X4150/x4250 Power Cord Kit:ATR:1683:0
In this Document
Applies to:Sun Fire X4150 Server - Version: Not ApplicableSun Fire X4250 Server - Version: Not Applicable and later [Release: N/A and later] Information in this document applies to any platform. GoalHow to replace a x4150/x4250 power cord kitSolutionDISPATCH INSTRUCTIONSWHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Basic Sun hardware FE skills, familiarity or training for X4450 platform. DELIVERY REQUIREMENT: Schedule with maintenance window within contractual terms. FIELD ENGINEER INSTRUCTIONS WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : Server has two power cords with dual power supply redundancy. The server can remain running if replacing only one power cord. If, not Customer should shut the operating system down gracefully (using "init 0"). WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Remove the power cable: 1. Verify the system has been shut down by the customer 2. Replace power cable. OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Restart system and have the System administrator verify functionality of system. PARTS NOTE: N/A REFERENCE INFORMATION: Sun Fire X4450 Server Service Manual http://download.oracle.com/docs/cd/E19150-01/ Sun Fire X4150, X4250, and X4450 Servers Diagnostics Guide http://download.oracle.com/docs/cd/E19150-01/ http://download.oracle.com/docs/cd/E19121-01/ TIME ESTIMATE: 15 minutes. Attachments This solution has no attachment |
||||||||||||
|