Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition | |||
|
|
Solution Type Technical Instruction Sure Solution 1310491.1 : How to replace a X4150/X4250 Power Supply:ATR:1688:0
In this Document
Applies to:Sun Fire X4150 Server - Version: Not ApplicableInformation in this document applies to any platform. GoalHow to replace a X4150/X4250 Power SupplySolutionDISPATCH INSTRUCTIONSWHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Basic Sun hardware FE skills, familiarity or training for X4450 platform. DELIVERY REQUIREMENT: Schedule with maintenance window within contractual terms. FIELD ENGINEER INSTRUCTIONS WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : Server has two power supply redundancy. The server can remain running if replacing only one power supply. If, not Customer should shut the operating system down gracefully (using "init 0"). WHAT ACTION DOES THE ENGINEER NEED TO TAKE: 1. Identify which power supply you will replace. 2. Disconnect the power cord from the power supply that you are replacing. The power supplies are hot-swappable, so you do not have to shut down the server or disconnect the second power supply. 3. Remove the power supply. 4. Installation is the reverse of this procedure. OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: Restart system and have the System administrator verify functionality of system. PARTS NOTE: N/A REFERENCE INFORMATION: DocID=820-1852 Server Service Manual http://download.oracle.com/docs/cd/E19121-01/ Sun Fire X4150, X4250, and X4450 Servers Diagnostics Guide http://download.oracle.com/docs/cd/E19150-01/ http://download.oracle.com/docs/cd/E19121-01/ TIME ESTIMATE: 15 minutes. Attachments This solution has no attachment |
||||||||||||
|